Ελληνικά / English
Monday, 20 November 2017
1
οΏ½
 
 

Quick Search

 

Current Tenders

No Οpen Tenders at present
 
 
 
Purchase Enquiries & Tenders
 

Quick Links

RES Penetration Data



RESPENBANNER



 Conferences



5th Inernational RES & Energy Efficiency


 

For Authorised Users only

Authorised Users are those approved by the Cyprus TSO as Market Participants.

 

 
 

Contact Us

TSO Building



Evangelistrias 68,

CY-2057 Strovolos

Cyprus



To locate us





Tel: +357 22 611 611

Fax:+357 22 611 666


 
Contact Information
 

2012

Power Stations during 2012

 

   Power Station

 

   Installed Capacity (MW)

 

 Installed Capacity of Added Units (MW)

   Type of UnitNo.Unit (MW)  201220112012

  Moni Power Station (EAC)

 Steam Turbine Generators*430,0120,0  150,0(30,0)
 Gas Turbines437,5150,0  150,000,0

 Τemporary ICE **

    35,0

35,0   35,000,0

 ICE APR ***

   120,0

120,0120,0
PS Total (MW)  425,0  335,090,0

  Dhekelia Power Station (EAC)

 Steam Turbine Generators 6 60,0360,0    360,000,0
 Internal Combustion Generators (1&2)

2

     50,0

     100,0

     100,0

     00,0

 Temporary ICE **

     60,0

60,060,000,0
PS Total (MW)  520,0  520,000,0

  Vassilikos Power Station (EAC)

Steam Turbine Generators000,0 00,000,000,0
Gas Turbines 1 37,5 37,5  37,5 00,0

Combined Cycle Plant ****

CCP 5 (2+1)

CCP 4 (1+1)

 

1

1

 

     220,0

     110,0

 

     220,0

      110,0

 

      00,0

       00,0

 

     220,0

      110,0

Temporary ICE **

70,0

70,070,000,0
PS Total (MW)437,5107,5330,0

  Vassiliko Cement Works (Self-producer)

 Internal Combustion Generators

  4

  2 

      1,5

      2,5

       6,0  

       5,0

      6,0

      5,0

       0,0 

       0,0

Total (MW) 11,011,00,0

Total Installed Capacity (MW)  

1393,5 973,5  420,0

* On 28/10/2012 Steam Turbines of Moni PS have been put on cold reserve.

** The Temporary ICE 165MW that have been rented by EAC to meet the demand after the destruction of Vassilikos PS Generating Facilities, have been totally disconnected from the System on 31/08/2012.

*** To meet the maximum demand for 2012, EAC rented 120MW Temporary ICE APR which were connected to the System on 15/6/2012 and disconnected on 15/09/2012. 

**** On 21/11/2012 the CCP 5 with capacity 220MW was put into commercial operation in full cycle and on 18/12/2012 the CCP 4 in combined cycle (1+1) with capacity 110MW.

 