2010

Cyprus Generation Capacity  for 2010

 

   Power Station

 

   Installed Capacity (MW)

 

 Installed Capacity of Added Units (MW)

   Type of UnitNo.Unit (MW)  201020092010

  Moni Power Station (EAC)

  Steam Turbine Generators630,0180,0  180,00
  Gas Turbines437,5150,0  150,00
PS Total (MW)  330,0  330,00

  Dhekelia Power Station (EAC)

 Steam Turbine Generators 6 60,0360,0    360,0 0
 Internal Combustion Generators (1&2)

3

3

16,3

16,3

50,0

50,0

 50,0

0

0

50

PS Total (MW)  460,0  410,050

  Vassilikos Power Station (EAC)

Steam Turbine Generators3130,0390,0390,00
Gas Turbines 1 37,5   37,5  37,5 0
Combined Cycle Plant 12202202200
PS Total (MW)647,5647,50

  Vassiliko Cement Works (Self-producer)

 Internal Combustion Generators

  4

  2 

      1,5

      2,5

       6,0  

       5,0

      6,0

      5,0

       0 

       

Total (MW) 11,011,00

Total Installed Capacity (MW)  

1448,5 1398,5  50

 

 

 