2004

Power Stations in operation during 2004

   Power Station 

   Rated Capacity (MW)  

 added units

   typeNo.Unit  200420032004

  Moni PS (EAC)

  Steam Turbine Generators630,0180,0180,00
  Gas Turbines437,5150,0150,00
PS Total (MW)  330,0330,00

  Dhekelia PS (EAC)

  Steam Turbine Generators660,0360,0360,00
PS Total (MW)  360,0360,00

 Vassilikos PS (EAC)

  Steam Turbine Generators2130,0260,0260,00
  Gas Turbines1 37,5  37,5   37,50
PS Total (MW)297,5297,50

  Vassiliko Cement Works (self producer)

  Internal Combustion Gemerators41,5    6,0   6,00
Island Total (MW)  993,5993,50

Μέγιστη Ζήτηση 2004: 821 MW

 

 